Ever wondered what actually happens after you send us your first sketch? This guide walks you through the complete SIP panel building process, with real timelines, costs, and customer outcomes.
The Complete Process Timeline: 3-10 Weeks
From first contact to weather-tight structure, here's what to expect:
Stage 1: Submit Your Basic Drawings (Same Day Turnaround)
Send us your initial sketch—hand-drawn is fine. We'll review it and provide initial feedback the same day.
Stage 2: Receive Your Estimated Quote (1-2 Business Days)
Based on your drawings, we'll provide a detailed estimate covering panels, splines, and delivery costs.
Stage 3: Professional CAD Drawings (1-2 Weeks, £300-600)
Pay the drawing fee and receive professional 3D CAD drawings tailored to your exact requirements.
Stage 4: Final Quotation and Order Confirmation
Review the final specification, confirm your order, and we'll schedule manufacturing.
Stage 5: Manufacturing in UK Facility (1+ Week)
Your panels are manufactured to exact specifications in our UK facility.
Stage 6: Delivery and Installation (2-3 Days to 4 Weeks)
Depending on project size, installation can take from a couple of days to several weeks.
Real Project Examples
Garden Office (4m x 3m)
- Total Cost: £4,050
- Timeline: 26 days from enquiry to completion
Two-Storey Extension (6m x 4m)
- Total Cost: £12,400
- Timeline: 7 weeks
Garden Studio with Pitched Roof
- Total Cost: £5,680
- Timeline: 33 days
Self-Build Bungalow (80m²)
- Total Cost: £24,800
- Timeline: 10 weeks
Common Questions
Do I need professional drawings to start?
No, rough sketches are perfectly fine initially. We can work with whatever you have.
How difficult is installation?
SIP panels are designed to be DIY-friendly, similar to flat-pack assembly.
How long do SIP panels last?
With proper installation, SIP panels have a lifespan of 60+ years.